AllocDB Work Breakdown

Status​

Draft. This document breaks the roadmap into concrete milestone-scoped tasks sized for implementation and review.

Task Rules​

Each task should:

  • produce one reviewable artifact
  • be small enough for roughly 1 to 3 days of focused work
  • have explicit dependencies
  • have acceptance criteria
  • end with concrete test evidence

Tracking template:

  • Goal
  • Inputs
  • Changes
  • Blocked By
  • Acceptance Criteria
  • Test Evidence
  • Non-Goals

Naming​

  • tasks use M#-T# identifiers such as M2-T08
  • spikes use M#-S# identifiers such as M1-S01
  • GitHub issues and PRs should use the same identifiers when they map to planned work

M0: Freeze v1 Semantics​

M0-T01: Approve spike list and guardrails​

Goal:

  • decide which implementation uncertainties justify spikes and which do not

Blocked by:

Acceptance criteria:

  • planned spikes are listed and time-boxed
  • semantics questions are explicitly excluded from spike scope

Test evidence:

  • docs review only

M0-T02: Define result codes​

Goal:

  • finalize deterministic result and error codes for v1 commands

Blocked by:

Acceptance criteria:

  • every command has success and failure outcomes documented
  • indefinite outcomes are distinguished from state-machine results

Test evidence:

  • docs review only

M0-T03: Define config knobs and bounds​

Goal:

  • finalize the required configuration surface for bounds and retention

Acceptance criteria:

  • MAX_* and slot-window knobs are listed in one place
  • no bound affecting correctness remains implicit

Test evidence:

  • docs review only

M0-T04: Define trusted-core crate boundaries​

Goal:

  • specify which modules belong to the trusted core and which do not

Acceptance criteria:

  • core, ingress, tooling, and observability boundaries are documented
  • dependency policy can be checked against module boundaries

Test evidence:

  • docs review only

M0-T05: Decide version-guarded command semantics​

Goal:

  • decide whether v1 needs conditional_confirm or another version-guarded write surface

Blocked by:

Acceptance criteria:

  • docs explain whether reservation_id already prevents the relevant ABA cases
  • if a version guard is adopted, the exact command shape and failure semantics are explicit
  • if deferred, the deferral rationale is written down explicitly

Test evidence:

  • docs review only

M1: Pure State Machine​

M1-S01: Fixed-capacity table experiment​

Goal:

  • compare candidate implementations for resource, reservation, and operation storage

Blocked by:

  • M0-T01
  • M0-T02
  • M0-T03

Acceptance criteria:

  • at least two plausible table shapes are compared
  • the experiment ends with one chosen approach and a short rationale
  • spike code is either deleted or clearly marked as non-production

Test evidence:

  • benchmark notes or focused experiment output

M1-S02: Timing-wheel experiment​

Goal:

  • validate bucket shape, overflow behavior, and retirement interaction for the expiration index

Blocked by:

  • M0-T01
  • M0-T03

Acceptance criteria:

  • overflow behavior is explicit
  • retirement and slot advancement are tested in the spike
  • one concrete timing-wheel shape is selected

Test evidence:

  • focused experiment output

M1-T01: Implement ID newtypes and core records​

Goal:

  • add Rust types for resource, reservation, operation, LSN, and slot identifiers

Blocked by:

  • M0-T02
  • M0-T03

Acceptance criteria:

  • no persistent-format field uses implicit-width integer types
  • compile-time layout checks exist where useful

Test evidence:

  • unit tests for parsing, construction, and size assertions

M1-T02: Implement fixed-capacity resource table​

Goal:

  • create the in-memory resource store with explicit capacity

Blocked by:

  • M1-T01
  • M1-S01

Acceptance criteria:

  • insert, lookup, and update semantics are deterministic
  • capacity exhaustion fails explicitly

Test evidence:

  • unit tests and capacity-bound tests

M1-T03: Implement fixed-capacity reservation table​

Goal:

  • create the shared active-plus-terminal reservation store

Blocked by:

  • M1-T01
  • M0-T03
  • M1-S01

Acceptance criteria:

  • supports active and terminal reservation retention
  • retirement frees slots for reuse

Test evidence:

  • unit tests for insert, retire, reuse

M1-T04: Implement fixed-capacity operation table​

Goal:

  • add bounded idempotency storage keyed by operation_id

Blocked by:

  • M1-T01
  • M1-S01

Acceptance criteria:

  • duplicate same-payload lookup returns the original result
  • mismatched payload returns operation_conflict

Test evidence:

  • unit tests for duplicates and conflict cases

M1-T05: Implement timing-wheel expiration index​

Goal:

  • create the fixed-capacity expiration structure keyed by deadline_slot

Blocked by:

  • M1-T01
  • M1-T03
  • M1-S02

Acceptance criteria:

  • bounded bucket behavior is explicit
  • overflow returns expiration_index_full

Test evidence:

  • unit tests for scheduling, draining, and overflow

M1-T06: Implement create_resource​

Goal:

  • add the pure apply logic for resource creation

Blocked by:

  • M1-T02
  • M1-T04

Acceptance criteria:

  • deterministic success and already_exists behavior

Test evidence:

  • state-machine unit tests

M1-T07: Implement reserve​

Goal:

  • add the pure apply logic for reservation creation

Blocked by:

  • M1-T02
  • M1-T03
  • M1-T04
  • M1-T05

Acceptance criteria:

  • only one active reservation may exist for a resource
  • deadline and reservation ID derivation are deterministic

Test evidence:

  • state-machine tests and contention property tests

M1-T08: Implement confirm​

Goal:

  • add confirm transition logic

Blocked by:

  • M1-T03
  • M1-T07

Acceptance criteria:

  • holder_id is checked
  • invalid-state and retired-reservation behavior are explicit

Test evidence:

  • transition tests and negative-path tests

M1-T09: Implement release​

Goal:

  • add release transition logic

Blocked by:

  • M1-T03
  • M1-T07

Acceptance criteria:

  • resource returns to available
  • terminal-state retention fields are set correctly

Test evidence:

  • transition tests and negative-path tests

M1-T10: Implement expire​

Goal:

  • add internal expiration command logic

Blocked by:

  • M1-T03
  • M1-T05
  • M1-T07

Acceptance criteria:

  • no-op behavior is deterministic for raced cases
  • no early reuse is possible

Test evidence:

  • interleaving tests with confirm and release

M1-T11: Add invariant assertion layer​

Goal:

  • centralize internal checks for table consistency and state agreement

Blocked by:

  • M1-T02 through M1-T10

Acceptance criteria:

  • resource and reservation state agreement is asserted
  • corruption paths fail closed

Test evidence:

  • invariant tests and negative injected-state tests

M1H: Constant-Time Core Hardening​

M1H-S01: Fixed-capacity open-addressed table experiment​

Goal:

  • compare deterministic open-addressing shapes for the trusted-core lookup tables

Blocked by:

  • M1 exit criteria

Acceptance criteria:

  • probe strategy, tombstone policy, and resize-free behavior are compared explicitly
  • the experiment ends with one deterministic table design and a short rationale
  • spike output includes expected full-capacity failure behavior

Test evidence:

  • focused experiment output or benchmark notes

M1H-T01: Implement deterministic fixed-capacity hash-table primitive​

Goal:

  • add the shared open-addressed table primitive for the trusted core

Blocked by:

  • M1H-S01

Acceptance criteria:

  • no randomized seeds are used
  • probe bounds are explicit and testable
  • full-capacity behavior fails explicitly

Test evidence:

  • primitive unit tests for insert, lookup, replace, delete, and full-capacity behavior

M1H-T02: Replace resource lookup with constant-time table access​

Goal:

  • remove binary-search and shifting-insert costs from resource lookup and update paths

Blocked by:

  • M1H-T01

Acceptance criteria:

  • resource lookup is constant-time in the intended design
  • resource updates do not require shifting unrelated records

Test evidence:

  • state-machine regression tests and table-focused unit tests

M1H-T03: Replace reservation and operation lookup with constant-time table access​

Goal:

  • remove binary-search and shifting-insert costs from reservation and operation lookup paths

Blocked by:

  • M1H-T01

Acceptance criteria:

  • reservation and operation lookup are constant-time in the intended design
  • duplicate-operation lookup no longer depends on sorted Vec order

Test evidence:

  • state-machine regression tests and table-focused unit tests

M1H-T04: Replace full-table retirement scans with ordered retirement draining​

Goal:

  • retire reservations and operation records in expiration order instead of using full-table retain scans on every apply

Blocked by:

  • M1H-T03

Acceptance criteria:

  • retirement work is proportional to expired entries
  • reservation retirement and operation dedupe retirement do not scan the whole lookup table
  • the ordering structure is bounded and deterministic

Test evidence:

  • retirement regression tests and capacity-bound tests

M1H-T05: Decide and implement version-guarded confirm handling​

Goal:

  • either add conditional_confirm or explicitly document why confirm remains keyed only by reservation_id

Blocked by:

  • M0-T05
  • M1-T08

Acceptance criteria:

  • if implemented, version mismatch behavior is deterministic and tested
  • if deferred, the docs explain which stale-read races are already prevented by reservation_id and which are intentionally unsupported in v1

Test evidence:

  • docs review only, or state-machine tests if the command is added

M2: Durability and Recovery​

M2-S01: WAL framing and torn-tail experiment​

Goal:

  • validate the binary framing shape and recovery boundary logic before committing to the real codec

Blocked by:

  • M0-T01
  • M1-T01

Acceptance criteria:

  • corrupted-frame and torn-tail cases are exercised
  • one framing shape is selected and documented

Test evidence:

  • focused experiment output

M2-T01: Define WAL frame codec​

Goal:

  • implement binary WAL frame encode and decode with checksum verification

Blocked by:

  • M1-T01
  • M2-S01

Acceptance criteria:

  • framing is explicit and versioned
  • invalid checksum is detected

Test evidence:

  • codec unit tests with corrupted frames

M2-T02: Implement append-only WAL writer​

Goal:

  • append validated frames to the live WAL file

Blocked by:

  • M2-T01

Acceptance criteria:

  • write path honors MAX_COMMAND_BYTES
  • fsync failures are surfaced explicitly

Test evidence:

  • file-backed tests with induced write failures

M2-T03: Implement recovery scanner​

Goal:

  • scan WAL history and stop at the last valid boundary

Blocked by:

  • M2-T01
  • M2-T02

Acceptance criteria:

  • torn tails are truncated
  • invalid frames do not leak into replay

Test evidence:

  • torn-tail recovery tests

M2-T04: Define snapshot format​

Goal:

  • define a snapshot representation for core tables and indexes

Blocked by:

  • M1-T02 through M1-T05

Acceptance criteria:

  • snapshot contains exactly the state required for replayable recovery
  • no implicit-layout serializer is used

Test evidence:

  • round-trip snapshot tests

M2-T05: Implement snapshot writer and loader​

Goal:

  • persist and load snapshots safely

Blocked by:

  • M2-T04

Acceptance criteria:

  • temp-file, fsync, rename flow is implemented
  • corrupted snapshot is rejected

Test evidence:

  • crash and corruption tests around snapshot load

M2-T06: Implement replay using the live apply path​

Goal:

  • recover allocator state by replaying WAL into the real state machine

Blocked by:

  • M2-T02
  • M2-T03
  • M2-T05
  • M1-T11

Acceptance criteria:

  • replay shares the same apply logic as live execution
  • live and recovered states match exactly

Test evidence:

  • replay-equivalence tests

M2-T07: Distinguish torn tails from durable-log corruption​

Goal:

  • classify WAL recovery stop reasons so only EOF torn tails are auto-truncated

Blocked by:

  • M2-T03
  • M2-T06

Acceptance criteria:

  • incomplete EOF tails are classified as expected crash artifacts
  • checksum or framing failures in the middle of durable history fail closed
  • recovery surfaces the failure kind and byte offset clearly

Test evidence:

  • torn-tail tests and mid-log corruption tests

M2-T08: Add safe checkpoint coordination and WAL truncation rules​

Goal:

  • coordinate snapshot replacement and WAL retention so recovery always has overlapping durable history

Blocked by:

  • M2-T05
  • M2-T06
  • M2-T07

Acceptance criteria:

  • checkpoint metadata makes the active snapshot anchor explicit
  • any WAL truncation preserves overlap through the previously successful snapshot anchor
  • crash during snapshot replacement or WAL rewrite remains recoverable
  • the implementation either rewrites WAL prefixes safely or introduces segmented retention; it does not pretend suffix truncation solves prefix-retention needs

Test evidence:

  • checkpoint crash/restart tests and retained-history recovery tests

M3: Submission Pipeline​

M3-T01: Implement command envelope validation​

Goal:

  • validate command envelope and payload before sequencing

Blocked by:

  • M0-T02
  • M2-T06

Acceptance criteria:

  • malformed commands fail before commit
  • validation does not mutate state

Test evidence:

  • request validation tests

M3-T02: Implement bounded submission queue​

Goal:

  • add the ingress queue with explicit overflow behavior

Blocked by:

  • M0-T03

Acceptance criteria:

  • overflow returns deterministic overload behavior
  • queue growth is bounded

Test evidence:

  • overload and backpressure tests

M3-T03: Implement sequencer​

Goal:

  • assign LSN and request_slot deterministically

Blocked by:

  • M2-T02
  • M3-T01
  • M3-T02

Acceptance criteria:

  • sequencing order is explicit
  • request-slot assignment is visible in WAL frames

Test evidence:

  • sequencing tests

M3-T04: Implement result publication and retry lookup​

Goal:

  • publish command results and resolve duplicate operation_id lookups

Blocked by:

  • M1-T04
  • M3-T03

Acceptance criteria:

  • same operation_id returns original result
  • mismatch returns operation_conflict

Test evidence:

  • duplicate and conflict-path tests

M3-T05: Implement strict-read fence​

Goal:

  • serve strict reads only after required LSN has been applied

Blocked by:

  • M2-T06
  • M3-T03

Acceptance criteria:

  • strict reads are tied to applied_lsn

Test evidence:

  • read-fence tests

M3-T06: Implement indefinite-outcome retry behavior​

Goal:

  • document and test retry with the same operation_id after timeout or reply loss

Blocked by:

  • M3-T04

Acceptance criteria:

  • no duplicate execution occurs for the same operation_id
  • ambiguity is resolved within retention only
  • submission failures distinguish definite pre-commit rejection from indefinite post-write ambiguity

Test evidence:

  • retry and retention-expiry tests

M4: Deterministic Simulation​

M4-S01: Simulation harness experiment​

Goal:

  • prove the trusted core can run under a seeded simulated driver without forking semantics

Blocked by:

  • M0-T01
  • M3-T03

Acceptance criteria:

  • real state-machine code runs under simulated slot advancement
  • at least one crash/restart scenario is exercised by the spike
  • one simulator shape is selected

Test evidence:

  • focused experiment output

M4-T01: Build simulated slot driver​

Goal:

  • run the core against a deterministic simulated clock

Blocked by:

  • M3-T03
  • M4-S01

Acceptance criteria:

  • slot advancement is deterministic and seedable

Test evidence:

  • simulator tests with reproducible seeds

M4-T02: Inject crash points​

Goal:

  • allow seeded crashes around WAL, apply, and recovery boundaries

Blocked by:

  • M2-T06
  • M4-T01

Acceptance criteria:

  • crash points are reproducible
  • recovery resumes with correct replay behavior

Test evidence:

  • crash-seed regression tests

M4-T03: Inject storage faults​

Goal:

  • simulate torn writes, checksum mismatch, and fsync failures

Blocked by:

  • M2-T03
  • M2-T05
  • M4-T01

Acceptance criteria:

  • fail-closed storage behavior is exercised in simulation

Test evidence:

  • storage fault-injection tests

M4-T04: Add seeded schedule exploration​

Goal:

  • vary ingress order, expiration order, and retry timing under a reproducible seed

Blocked by:

  • M4-T01

Acceptance criteria:

  • failures can be reproduced from seed

Test evidence:

  • schedule-seed regression cases

M5: Single-Node Alpha​

M5-T01: Add minimal API surface​

Goal:

  • expose the single-node allocator through a stable alpha API

Blocked by:

  • M3-T06

Acceptance criteria:

  • API matches documented command semantics
  • indefinite-outcome behavior is documented for clients

Test evidence:

  • API integration tests

M5-T02: Add metrics and health signals​

Goal:

  • expose core operational signals for lag, overload, and recovery

Blocked by:

  • M3-T02
  • M4-T03

Acceptance criteria:

  • logical_slot_lag = current_wall_clock_slot - last_request_slot is visible outside the trusted core
  • expiration backlog and recovery status are visible
  • queue pressure is visible
  • operation-table utilization is visible before operation_table_full

Test evidence:

  • metrics integration tests

M5-T03: Add benchmark harness​

Goal:

  • measure hot-spot contention and boundedness behavior

Blocked by:

  • M5-T01

Acceptance criteria:

  • benchmark scenarios include one-resource-many-contenders and high retry pressure

Test evidence:

  • documented benchmark runs

M5-T04: Write operator runbook​

Goal:

  • document startup, recovery, overload, and corruption-handling behavior

Blocked by:

  • M5-T02

Acceptance criteria:

  • runbook matches actual system behavior

Test evidence:

  • docs review only

M6: Replication Design Gate​

M6-T01: Expand replication protocol notes​

Goal:

Blocked by:

  • M1 through M5 exit criteria

Acceptance criteria:

  • protocol family and invariants are explicit
  • replication does not rewrite single-node semantics

Test evidence:

  • design review only

M6-T02: Define replicated simulation plan​

Goal:

  • specify how deterministic simulation extends to replicated execution

Blocked by:

  • M6-T01

Acceptance criteria:

  • partitions, primary crash, and rejoin are part of the simulation plan

Test evidence:

  • design review only

M6-T03: Define Jepsen validation plan​

Goal:

  • specify the Jepsen workloads and properties required before any replicated release

Blocked by:

  • M6-T02

Acceptance criteria:

  • covers client ambiguity, failover, recovery, and linearizable behavior
  • workloads and invariants are explicit and tied to replicated semantics

Test evidence:

  • design review only

M7: Replicated Core Prototype​

M7-T01: Add replicated node state and durable protocol metadata​

Goal:

  • build the replica wrapper state and durable protocol metadata required by the first replicated prototype

Blocked by:

  • M6-T03

Acceptance criteria:

  • replicated node startup has explicit durable protocol metadata
  • local validation and faulted-state entry are defined in code and tests
  • no simulator-only replica execution path is introduced
  • docs stay aligned if the persisted metadata contract changes

Test evidence:

  • ./scripts/preflight.sh

M7-T02: Build deterministic 3-replica cluster harness​

Goal:

  • build the deterministic in-process cluster harness for the replicated prototype

Blocked by:

  • M7-T01

Acceptance criteria:

  • the harness runs three real replicas without mock state-machine semantics
  • message delivery, partitioning, crash, and restart are explicit driver actions
  • the same seed and starting state reproduce the same transcript
  • docs and harness APIs stay aligned with testing.md

Test evidence:

  • ./scripts/preflight.sh

M7-T03: Implement quorum write path with one configured primary​

Goal:

  • implement the first majority-backed write path with one configured primary and primary-only reads

Blocked by:

  • M7-T01
  • M7-T02

Acceptance criteria:

  • committed write results are published only after majority durable append
  • backups do not apply entries before they are committed
  • the existing allocator executor remains the only apply path
  • tests cover normal quorum write and primary-only read behavior

Test evidence:

  • ./scripts/preflight.sh

M7-T04: Add view change and fail-closed reads on quorum loss​

Goal:

  • implement higher-view takeover plus fail-closed read behavior under quorum ambiguity

Blocked by:

  • M7-T03

Acceptance criteria:

  • a quorum-lost primary fails closed for reads and writes
  • a new primary reconstructs the latest safe committed prefix before normal mode
  • committed entries survive failover unchanged
  • tests cover primary loss, higher-view takeover, and stale-node read rejection

Test evidence:

  • ./scripts/preflight.sh

M7-T05: Add suffix catch-up, snapshot transfer, and rejoin​

Goal:

  • implement stale-replica catch-up and safe rejoin

Blocked by:

  • M7-T04

Acceptance criteria:

  • stale replicas can rejoin without rewriting committed history
  • divergent uncommitted suffix is discarded safely during catch-up
  • corrupted replicas do not vote, lead, or serve before repair
  • tests cover suffix-only catch-up, snapshot transfer, and faulted rejoin rejection

Test evidence:

  • ./scripts/preflight.sh

M7-T06: Promote replicated simulation scenarios into executable tests​

Goal:

  • turn the replicated simulation plan into executable regression coverage

Blocked by:

  • M7-T05

Acceptance criteria:

  • partition, primary-crash, and rejoin scenarios execute in the real replicated harness
  • the same seed and starting state reproduce the same replicated transcript
  • promoted tests check the invariants documented in testing.md
  • failing schedules can be replayed directly from recorded transcript data

Test evidence:

  • ./scripts/preflight.sh

M8: External Cluster Validation​

M8-T01: Build multi-process local replicated cluster runner​

Goal:

  • build the first multi-process local cluster runner for replicated AllocDB

Blocked by:

  • M7-T05

Acceptance criteria:

  • a local operator can start and stop a three-replica cluster from one command surface
  • node identities and durable workspaces remain stable across restart
  • logs and control hooks are sufficient for follow-on fault injection
  • docs stay aligned with the local cluster runner usage

Test evidence:

  • ./scripts/preflight.sh

M8-T02: Add local fault-control harness for process and network disruption​

Goal:

  • add a local fault-control harness for process crash, restart, and network isolation

Blocked by:

  • M8-T01

Acceptance criteria:

  • process and network disruption are controllable through one local harness
  • the harness can isolate stale primaries and later heal the cluster
  • cluster timelines are recorded well enough for later checker and debug use
  • follow-on validation work can reuse the same fault-control surface

Test evidence:

  • ./scripts/preflight.sh

M8-T03: Build local QEMU replicated testbed​

Goal:

  • build the local QEMU-backed replicated cluster testbed

Blocked by:

  • M8-T02

Acceptance criteria:

  • the QEMU environment boots a three-replica cluster plus one control node locally
  • control hooks can isolate networks, reboot guests, and collect logs
  • the environment is repeatable enough for scripted validation runs
  • docs describe how the QEMU testbed maps to the first Jepsen gate

Test evidence:

  • ./scripts/preflight.sh

M8-T04: Implement Jepsen harness against QEMU-backed cluster​

Goal:

  • implement the Jepsen harness and release-blocking validation runs against the QEMU-backed cluster

Blocked by:

  • M7-T06
  • M8-T03

Acceptance criteria:

  • the Jepsen harness runs the documented workload families against the QEMU-backed cluster
  • ambiguous outcomes are retried and interpreted with stable operation_id semantics
  • the documented release blockers are enforced automatically by the analysis step
  • the external validation docs stay aligned with the implemented harness

Test evidence:

  • ./scripts/preflight.sh

M9: Lease Kernel Follow-On​

M9-T01: Freeze generic lease-kernel scope and non-goals​

Goal:

  • define the minimal generic AllocDB lease-kernel surface needed by downstream consumers without moving scheduler or product policy into the trusted core

Blocked by:

Acceptance criteria:

  • bundle ownership, fencing, revoke, and liveness-boundary work are explicitly in or out of scope
  • Kubernetes, queueing, topology, routing, and chargeback concerns stay explicitly outside AllocDB
  • the follow-on is documented as a generic lease-kernel extension, not a product-specific fork

Test evidence:

  • docs review only

M9-T02: Decide bundle lease data model and invariants​

Goal:

  • choose the exact ownership model for all-or-nothing multi-resource commits

Blocked by:

Acceptance criteria:

  • the bundle identifier strategy is explicit
  • per-resource and bundle-level invariants are explicit
  • partial visibility and partial success are ruled out explicitly
  • retained-history rules for bundle members are documented

Test evidence:

  • docs review only

M9-T03: Decide fencing-token and stale-holder semantics​

Goal:

  • define how external holders prove current authority and how stale actors are rejected

Blocked by:

  • M9-T02

Acceptance criteria:

  • token shape and monotonicity rules are explicit
  • stale-holder rejection outcomes are documented
  • replay and failover preserve the same fencing behavior

Test evidence:

  • docs review only

M9-T04: Decide revoke and liveness-boundary semantics​

Goal:

  • define explicit revoke behavior and the boundary between external liveness observation and trusted-core ownership transitions

Blocked by:

  • M9-T01
  • M9-T03

Acceptance criteria:

  • revoke is documented as an explicit logged transition
  • the trusted core does not read wall-clock time or external heartbeats directly
  • reclaim semantics still preserve the late-not-early reuse rule

Test evidence:

  • docs review only

M9-T05: Extend semantics, API, and fault-model docs for the approved lease surface​

Goal:

  • fold the approved follow-on decisions into the authoritative product and engineering docs

Blocked by:

  • M9-T02
  • M9-T03
  • M9-T04

Acceptance criteria:

  • semantics.md, api.md, architecture.md, and fault-model.md reflect the approved command and result-code surface
  • the docs make clear which previous single-resource commands remain unchanged, which are generalized, and which are superseded
  • retention and idempotency rules for the new primitives are explicit

Test evidence:

  • docs review only

M9-T06: Implement atomic bundle commit in the trusted core​

Goal:

  • add the real all-or-nothing multi-resource ownership transition in allocdb-core

Blocked by:

  • M9-T05

Acceptance criteria:

  • a successful bundle commit acquires all target resources atomically
  • failure leaves no partial ownership behind
  • deterministic capacity and conflict failures remain explicit and bounded
  • trusted-core invariants cover bundle membership and per-resource exclusivity

Test evidence:

  • ./scripts/preflight.sh

M9-T07: Implement fencing tokens and stale-holder rejection​

Goal:

  • add the approved authority token model to live execution, replay, and read surfaces

Blocked by:

  • M9-T06

Acceptance criteria:

  • holder-facing operations can reject stale authority deterministically
  • duplicate requests remain idempotent under the new token rules
  • the read surface exposes the authority information needed by external controllers

Test evidence:

  • ./scripts/preflight.sh

M9-T08: Implement explicit revoke and safe reuse rules​

Goal:

  • add revoke behavior without weakening the late-not-early reuse guarantee

Blocked by:

  • M9-T07

Acceptance criteria:

  • revoke transitions are logged and replayable
  • duplicate revoke requests are deterministic
  • revoked ownership cannot be reused early under crash, retry, or failover

Test evidence:

  • ./scripts/preflight.sh

M9-T09: Extend WAL, snapshot, recovery, and transport surfaces for lease primitives​

Goal:

  • preserve the new lease semantics through persistence, restart, and external API boundaries

Blocked by:

  • M9-T08

Acceptance criteria:

  • WAL and snapshot formats can encode the new primitives
  • live apply and replay share the same path and produce the same results
  • wire-level request and response surfaces expose the approved fields without ambiguity

Test evidence:

  • ./scripts/preflight.sh

M9-T10: Preserve lease primitives across replication and failover​

Goal:

  • extend the replicated path so bundle ownership, fencing, and revoke semantics survive quorum replication and view change unchanged

Blocked by:

  • M9-T09

Acceptance criteria:

  • replication does not invent a second apply path for the new primitives
  • failover preserves committed bundle ownership and fencing outcomes
  • stale primaries and stale holders still fail closed

Test evidence:

  • ./scripts/preflight.sh

M9-T11: Add simulation and regression coverage for bundle, revoke, and stale-holder faults​

Goal:

  • promote the new lease-kernel safety rules into reproducible regression coverage

Blocked by:

  • M9-T10

Acceptance criteria:

  • tests cover duplicate bundle retries, partial-failure avoidance, revoke races, stale-holder rejection, crash recovery, and replicated failover
  • the new scenarios run through the same deterministic simulation and replicated-validation surfaces already used elsewhere in the repo

Test evidence:

  • ./scripts/preflight.sh

Suggested First Slice​

If implementation starts immediately, the highest-value first slice is:

  1. M0-T01
  2. M0-T02
  3. M0-T03
  4. M1-T01
  5. M1-S01
  6. M1-S02
  7. M1-T02
  8. M1-T03
  9. M1-T04
  10. M1-T05
  11. M1-T07
  12. M1-T08
  13. M1-T09
  14. M1-T10
  15. M1-T11

That sequence yields the pure allocator core before any durability or API work.